Mayrain QC and inspections

Mayrain have strictly and whole sets regulation for quality control. In our mind quality is the most import thing in production. That’s why we can keep long business relationship with hundreds of old customers. Mayrain good service is not only one words, our words is our done. Mayrain have perfect QC system.

The first inspection(When we finish fabric, before making mass goods)
1 Check the color, thickness, softness, feel, and other quality of the fabric meet the order requirements.
2 Check accessories, including packaging bags, buttons, tags, washing labels, and printing meet the order requirements.
3 Before production, all requirements are clearly informed to the workshop with documents.
4 If any problems are found, inform the workshop immediately and follow up and correct it. Take photos of the problematic part and remark. Strictly implement inspection rules.
news (1)

The second inspection (Mid-production inspection)
1. Check workmanship: sewing, heat sealing, printing, etc. are the same as prenatal
2. Size measurement, print position, other client’s requirements.
news (2)
The third inspection (when finished more than 80% of production and packing (before shipment):
1. Check Packing situation: The quantity of each box, the total number of boxes. The mark, barcode, etc. the same as the contract. The packaging is intact, durable and meets export standards. Take photos.
2. Focus on the problems that occur during the first inspection. Number of spot checks: 5-10%
3. Check the quality of the contract requirements.
4 Inspection quantity: According to AQL II 2.5/4.0 inspection standard.
news (3)
The fourth inspection container inspection
1. Record and photograph the container number and seal number. take photos of the empty before loading, when half loaded, and after finishing and sealing.
2. Check the damage package and re-pack in time.
news (4)
news (5)
Mayrain inspection rules
Inspection is for customers, according to the requirements of different customers, targeted inspections.
1. Fill in the inspection form for each inspection.
2. Different orders are inspected in one day and the same workshop, operated according to each requirement.
3. The inspection form for the same contract is numbered in sequence, such as: 21.210 The first inspection.
4. Save the inspection documents,photos, videos as a file.
The details work reflect the best service & responsibility of Mayrain.


Post time: Nov-02-2021