This method is generally the use of hot rolled laminated plate as raw material, the annealed steel plate is first sent to the pickling workshop, with sulfuric acid or hydrochloric acid to remove the surface of the steel sheet oxygen hot galvanizing method. After pickling, the steel plate immediately enters the tank to soak and wait for galvanized, which can prevent the reoxidation of the steel plate. After pickling, water cleaning, squeeze dry, drying, into the zinc pot, the temperature has been maintained at 445-465℃.
Cold galvanizing, also called electric galvanizing, is the use of electrolytic equipment to remove oil, pickling, after the pipe fitting into the composition of zinc salt solution, and connected to the negative electrode of the electrolytic equipment. Wire factory on the opposite side of the pipe fittings placed zinc plate, connected to the positive electrode of the electrolytic equipment is connected to the power supply, the use of current from the positive electrode to the negative electrode will deposit a layer of zinc on the pipe fittings, cold plating pipe fittings is first processed after galvanized.
Large hexagonal net called stone cage net, stone cage net before delivery, must be folded into a simple surface, packed compression after delivery. Then put it into the right position to open, and then put the appropriate size of the stone into the cage, the lid tight, and then the various stone cage net and adjacent stone cage net tied up.
Hexagonal net structure can be used for slope support, excavation, rock face net mine support form, slope vegetation (green color), railway road isolation block, it can be made into a cage, pad, used for river, flood dam and seawall erosion protection and reservoir, river closed cage. Driving and guiding rivers and waterlogging disasters are major water erosion damage to rivers, resulting in flooding, resulting in significant loss of property and loss of water and soil. Because of this, in dealing with these problems, the application of the living grid structure becomes a solution plan, which makes it possible to protect the shore forever.